Factory
Workshop using the flow of people, logistics, separate design concept, to ensure the safety of the production environment, reasonable, humane. Laboratory, emulsification, filling workshop, semi-finished products, ingredients, static disinfection packaging material storage room and locker room with one hundred thousand air purification standards, other regions of the three hundred thousand air purification standards, the removal of dust and bacteria in the air of 99.97%, to ensure that the manufacturing and filling and packaging of all products in the safe the pollution of environment.
Have a skin test instrument, with 6 automatic production lines, automatic emulsifying equipment, filling machines, employees up to more than and 200 people, planning and design production capacity: cream of more than 10 tons, single production capacity reached more than 150 thousand, can fully meet the domestic first-line brand production requirements.